Category Archives: hazardous waste

[NEWS] California Biomass Company Ordered to Pay $4.2 Million for Dioxin in Ash

– May 5, 2017, Times Herald

Woodland-Biomass-Ltd-21

Photo: California Biomass Energy Alliance

A Yolo County biomass company was ordered Friday to pay a multi-million dollar penalty as result of civil settlement reached in an environmental protection action.

Woodland Biomass Power was sentenced by Yolo County Superior Court Judge Samuel McAdam to pay $4.22 million for penalties, costs and remediation.

The action was filed by district attorneys from Yolo, Solano and San Joaquin counties.

Read more

[NEWS] EPA Proposes Classifying Treated Railroad Ties as Nonhazardous Waste

– by Anna Simet, November 3, 2016, Biomass Magazine

railroad_ties_biomass_magazine

Photo: Biomass Magazine

The U.S. EPA has proposed an amendment that will add additional treated railroad ties to its list of categorical nonwaste fuels under the Non-Hazardous Secondary Materials Rule.

Under the Resource Conservation and Recovery Act, NHSM rulemakings identify which nonhazardous secondary materials are or aren’t solid wastes when burned in combustion units. If material is a solid waste under RCRA, a combustion unit burning it is required to meet the Clean Air Act Section 129 emission standards for solid waste incineration units. If the material is not a solid waste, combustion units are required to meet the CAA Section 112 emission standards for commercial, industrial, and institutional boilers, much less stringent standards.

Read more

[NEWS] Radioactive Fukushima Wood to Generate 20 Megawatts of Biomass Power

– by Brian Parkin, October 26, 2016, Bloomberg

Homes And Businesses In Fukushima As Five Year Anniversary Of Devastating Tsunami Approaches

Fukushima (Photo: Christopher Furlong)

Japan is turning to a small German company to generate power from timber irradiated by the Fukushima Dai-Ichi nuclear meltdowns.

Closely held Entrade Energiesysteme AG will sell electricity from 400 of its container-sized biomass-to-power machines set up in Fukushima Prefecture, said the Dusseldorf-based company’s Chief Executive Officer Julien Uhlig. The devices will generate 20 megawatts of power by next year and function like a “biological battery” that kicks in when the sun descends on the the region’s solar panels, he said.

Read more

[NEWS] Waste Incineration Shows Growth in New Jersey, Maine and Florida

– by Carl Weinschenk, October 20, 2016, Energy Manager Today

waste_energy_manager_today

Photo: Energy Manager Today

The waste to energy (WTE) sector is not huge, but it is showing signs of growing.

This week, New Jersey moved toward joining the ranks of states that require food waste to be utilized as an energy source. The rationale for the requirement is two-fold: Rotting food releases methane, which is a harmful greenhouse gas. Transitioning the material to energy would help alleviate that problem. And in addition to addressing the methane issue, the energy that is produced reduces reliance on fossil fuels.

Read more

[NEWS] Indiana Cement Plant Loses Appeal to Burn Hazardous Waste

– by Madeleine Winer, August 18, 2016, Courier Journal

essroc_cement_plant

Essroc Cement Plant (Matt Stone/Courier Journal)

The cement plant in southern Indiana that wants to burn hazardous waste for fuel will have to apply for rezoning.

After a more than three-hour hearing, the Clark County Board of Zoning Appeals decided to uphold a letter written by the president of the plan commission and acting executive director that deemed an earlier decision to allow the Essroc to burn alternative fuel as void.

“I’m disappointed in the decision,” said Jeremy Black, manager at Essroc’s plant in Speed, Indiana, “but I’m confident that we’ve got other means to obtain the required authorization to continue with the project.”

Read more

[NEWS] Pennsylvania Town Afire Over Incinerator Proposal

– by Jeff Platsky, August 8, 2016, Press and Sun Bulletin

susquehanna_county_pennsylvania_incinerator_proposal

Graphic: Times Tribune

Armed security guards stood at both sides of the room.

Township supervisors were cordoned off from the sizable crowd. Not 10 minutes into the meeting, the first disgruntled audience member walked out.

This is otherwise peaceful Susquehanna County, a rural outpost in northeast Pennsylvania where few things appear to rile its 42,000 residents.

In this Endless Mountains region of Pennsylvania, the neighborly feel has taken an ugly turn as reports of a proposed industrial incinerator on a 114-acre plot just east of Interstate 81 off the Gibson exit put some residents in a panic.

Now, emotions are clearly pitched. Tempers flare. Residents are on edge. And details on this potentially landscape-changing project are few.

Read more

[NEWS] Cement Plant Challenges Zoning to Burn Hazardous Waste

– by James Bruggers, August 5, 2016, Courier Journal

Essroc_cement_plant

Essroc cement plant (Matt Stone/Courier Journal)

The cement plant in southern Indiana that wants to burn hazardous waste for fuel has challenged a Clark County determination that it needs new zoning or a variance.

Essroc argues in a filing with the Clark County Board of Zoning Appeals that county officials were wrong to reverse an earlier determination that no zoning changes were needed.

Local zoning laws don’t allow such a reversal.

The Courier-Journal reported on June 24 that Speed plant’s plans to burn hazardous waste for fuel had been thrown into disarray, with the reversal of a December 2015 zoning determination that had been favorable to the company. County officials have claimed they were misled by the company – that they subsequently learned the company has applied for hazardous waste storage permits from Indiana regulators.

Read more

« Older Entries